Problem 01
What does 2501 do when a Rundeck job chain stops partway?#
It finds the job that failed and why from the scheduler’s own state, fixes the cause, and reruns the chain from its entry point until it runs green. Finishing on wrong data is worse than not finishing, so control checks are never bent to pass.
It checks
- Recent executions, the full log and which step failed or never ran.
- The failing job’s script and the files it works on.
- The data file against its control file and the spool copy.
It may
- Fix the underlying cause.
- Rerun the chain from its entry point.
It leaves to people
- Control values, which come from the upstream system.
- Disabling, deleting or unscheduling jobs, or editing a chain to skip a step.

